SUPPLIER PRODUCT ASSURANCE REQUIREMENTS
GENERAL REQUIREMENTS: Unless otherwise specified in the
purchase order, the following general requirements, terms and conditions
apply to Macrolink purchase orders.
Purchase Order Identification: The Macrolink purchase order
number must be plainly marked on all packages, bills of lading, invoices
and shipping documentation. Packing lists shall accompany each box
or package shipment. In the absence of a packing list, Macrolink
count shall be conclusive.
Purchase Order Change: Macrolink may, at any time, by written
order make changes within the general scope of a purchase order in any
one or more of the following: (1) Documentation, designs or
specification. (2) Methods of shipment or packing. (3) Place of
delivery. (4) Period of performance of work. (5) Delivery schedule.
If any such change causes an increase or decrease in the cost of work
under a purchase order, an equitable adjustment shall be made in the
purchase order price. Macrolink reserves the right to terminate a
purchase order at any time. Any claim by Seller for adjustment because
of a purchase order change by Macrolink shall be made within thirty days
from the date of receipt of change notification.
Entire Agreement: The Purchase Order constitutes the entire
agreement between Macrolink and the Seller. The Seller, by
shipping the goods ordered, agrees to the terms and conditions set
forth.
Furnished
Items: Seller assumes complete liability for any Macrolink
owned or Macrolink furnished tooling, items or materials lost, damaged
or otherwise not satisfactorily dispositioned. Title to all
Macrolink furnished tooling, items or materials shall remain vested in
Macrolink.
Seller Quality Control
System:
The Seller shall
maintain a quality system that complies, as a minimum requirement with
the specification designated below. The Seller’s system shall be
subject to audit by Macrolink’s Quality Representative. Waivers to
quality system requirements are not valid unless obtained in writing
from Buyer.
A.
MIL-I-45208 (Latest revision as of date of purchase order)
B.
ISO-9000
C.
AS9101
Conformance to Requirements:
The Seller shall be responsible for furnishing items
that conform to the requirements of the purchase order and neither
surveillance, inspection, and/or tests made by Macrolink or compliance
with Product Assurance Requirements shall relieve the Seller of this
responsibility.
The supplier shall flow all requirements to sub-tier suppliers.
Supplier shall specify on the purchase orders to sub-tier suppliers that
they shall only procure parts from the original manufacturer, authorized
distributor or authorized franchised dealer.
By making shipment under this purchase order, the Seller automatically
certifies that the materials (except when the material are furnished by
Macrolink) used in the item shipped and the processes applied to such
articles comply with the applicable documentation and specifications.
Current Specifications:
Material ordered according to nationally recognized specifications or
military standards shall be supplied in accordance with the latest
revisions unless otherwise specified.
Acceptance: Unless otherwise specified, ownership of these
goods shall pass from Seller to Macrolink at the f.o.b. point specified
on the purchase order. Passing of ownership does not constitute
final acceptance of the goods nor does it waive any of the other
provision of the purchase order.
All goods ordered will be subject to final inspection and approval by
Macrolink after delivery, not withstanding prior payment. The
Seller expressly agrees that payment does not constitute final
acceptance. Macrolink may reject any items that contains defective
material or workmanship, or does not conform the specifications.
Rejected items may be returned at the Seller’s risk and expense at the
full invoice price plus applicable incoming transportation charges.
Approval by Macrolink inspection or failure to inspect shall not waive
Macrolink’s rights on the guarantee or warranty by Seller.
Documentation: Macrolink may refuse to accept items delivered
under a purchase order if the Seller fails to submit the certification,
documentation, test data or reports specified in the purchase order.
Unauthorized Repairs: Without Buyer’s approval, Seller may not
repair by welding, brazing, soldering or adhesives, parts damaged or
found to be faulty during fabrication. Defects in castings or
forgings shall not be repaired by any method unless authorized by the
Buyer in writing.
Change in Approved Processes, Materials or Procedures:
Seller
shall not change or substitute any specified process, material or
procedure without prior written Buyer approval. The Seller shall
not change any process, material or procedure from that used to qualify
the process, material or procedure without prior notification to Buyer
and approval by authorized customer representative.
Unauthorized Submittal of Production Parts:
When the purchase
order requires Buyer acceptance of the first article, Seller shall not
submit parts from a production run for Buyer inspection prior to Buyer’s
acceptance of such first article.
Improper Re-submittal: Articles rejected by the Buyer and
subsequently resubmitted to the Buyer shall be clearly and properly
identified as resubmitted articles. Seller’s shipping
documentation shall contain a statement that articles are replacement of
reworked articles and shall also refer to Buyers rejection document.
|
A discrepancy report is to be initiated by the
Seller for any departure from documentation, specifications or
other purchase order requirements and must adequately describe
such departures, including a complete description of the cause
and corrective action taken to preclude recurrence. The
discrepancy report shall be submitted to Macrolink Purchasing
Department that will arrange for material review. A copy
of the discrepancy report will be returned to the Seller,
showing material review action taken. Seller shall not
ship a discrepant item reported on a discrepancy report without
Buyer’s concurrence.
|
| |
Government
Review of Quality Control or Inspection:
The Seller's Quality Control or Inspection Systems and
Manufacturing processes are subject to review, verification and
analysis by Macrolink and authorized Government Representatives
upon request. |
Right of Access:
The Seller shall grant right of access to Macrolink, Macrolink's
customer, and regulatory authorities to all facilities involved in the
order and all applicable records.
Flow Down Requirements:
The Seller shall flow down to all their suppliers and sub-tier
suppliers the applicable requirements of Macrolink Purchasing.
Retention of Records:
The seller shall maintain all records involved in the purchasing
order for a minimum of 3 years from date of delivery.
Control of Special
Processes:
The Seller must be approved by Macrolink to perform required special
processes and must use special process supplies acceptable to Macrolink.
Special processes, indicated below, require approval or certification of
the process equipment and the procedures. Certification by a
responsible representative of the Seller shall be included with each
shipment. Certification shall indicate all special processes
performed, applicable specifications (including class type, grade, etc.)
and the name of special processor(s).
Special Processes:
A. Soldering
B. Silk Screening
C.
Surface Finish, Coating, Treatment
D.
Plating
E.
Testing (NDT, Chemical,
Environmental,
etc)
F.
Brazing
G.
Welding
H.
Printed
Circuit Board Fabrication
I.
Casting/Forging
J.
Heat
K.
Other specified on
purchase order
Notification of Facility Change: Seller shall not relocate any
production, manufacturing and/or processing facilities during
performance of the purchase order, without promptly notifying Buyer and
affording Buyer an opportunity to examine such facilities for compliance
with Quality Assurance requirements, including any necessary approvals.
Default Cancellation:
Macrolink reserves the right to cancel this order in the event of
default by the Seller due to failure to deliver the item specified,
comply with delivery dates and/or failure to meet the requirements
specified in the purchase order including quality system requirements.
|
BUYER SOURCE INSPECTION Items to be
delivered under this purchase order require inspection, tests or
surveillance by Macrolink Quality Representative at the Seller’s
plant. Sufficient advance notice (two working days) for local
travel plus travel time for distant locations) must be given
Macrolink to permit scheduling of source inspection. The
Seller shall notify Macrolink’s Purchasing Department when the
product is ready for source inspection. Source inspection does
not relieve the Seller of the responsibility for compliance with all
purchase order requirements. Evidence of Macrolink source
inspection must accompany or be shown on the shipping documentation.
Macrolink reserves the right of final acceptance at Macrolink’s
facility. Items submitted under this clause shall have passed
Seller’s inspection and test. | |
GOVERNMENT INSPECTION
Government inspection is required prior to shipment from
Seller’s plant. Upon receipt of this purchase order,
Seller shall promptly notify the Government Representative who
normally services the Seller’s plant, in order that appropriate
planning for Government inspection can be accomplished. If the
representative of the Government Inspection Office cannot be
located, Macrolink should be notified immediately. | |
| |
INSPECTION AND TEST PLAN
Seller shall prepare an inspection and test plan for the items
delivered under the purchase order. Two copies of the plan
shall be submitted for Macrolink a minimum of thirty days prior
to production. | |
INSPECTION TEST REPORT Seller shall submit with each shipment a report for the
delivered end items or assemblies. The following
information included as a minimum: part number, revision letter,
nomenclature, purchase order number, lot number, quantity
passed/rejected, date of inspection/test and signature/stamp of
Seller’s Inspection/Test representative.
A. Summary of data and form only required. | |
TEST SAMPLES | |
FIRST ARTICLE INSPECTION Macrolink acceptance of first article is required prior to the
production run. The first article shall be made in
accordance with AS9102 and shall include Seller's Part Number,
Order Number and Part Name along with Macrolink Part Number and
Part Name if applicable. The Seller is required to: | |
ACCEPTANCE TEST PROCEDURE
Seller shall prepare an acceptance test procedure for the items
to be delivered under the purchase order, to include as a
minimum the equipment, sequence and steps necessary to perform
the acceptance test. The procedure shall contain a
requirement for recording, including as a minimum the following
data (for submission to Macrolink) part number, part name,
revision letter, purchase order number, serial/lot number,
sequence number, criteria measured or tested, test results, test
date and signature of Seller’s Inspection Representative.
Two copies of the acceptance test procedure shall be submitted
for Macrolink Quality Assurance approval at least 2 weeks prior
to performance of the initial acceptance test. Any
subsequent change to the acceptance test procedure requires
prior approval of Macrolink Quality Assurance representative. | |
ACCEPTANCE TEST PROCEDURE (ATP) DATA
Seller shall submit with each delivery a completed copy of the
related ATP data sheet(s) with each serialized/identified
delivered end item. The test data supplied must allow
correlation of the tests and the items supplied. | |
CERTIFICATION OF CONFORMANCE & RECORDS
| |
MAINTAINED RECORDS
The Seller
agrees to maintain objective evidence, including records
establishing traceability and conformance of materials and
components used, of the inspection and tests performed in the
course of manufacturing, testing inspection, preserving,
packaging and packing of said items. Those records shall
be made available to Macrolink or Macrolink's customers for
review upon Macrolink's request. Seller agrees to retain
records required by this purchase order for a minimum of three
(3) years unless otherwise expressly stated herein. | |
MATERIAL IDENTIFICATION INSTRUCTIONS
B. Bag and tag parts.
C. Tag parts.
D. Identify per procurement instructions
requirements. | |
SERIALIZATION | |
LOT CONTROL AND MATERIAL TRACEABILITY | |
MACROLINK SUPPLIED INFORMATION
With the initial order, Macrolink will furnish at no cost to the
Buyer two legible copies of applicable specifications, drawings
and/or catalogs or catalog pages sufficient to inspect and/or
test the product(s) specified in the purchase order. | |
PRODUCT CHANGE APPROVAL
The Seller shall not make any changes in the end items accepted
by Macrolink under a previous purchase order without prior
written approval by Macrolink. These changes include
product design, composition, configuration (form, fit, function
or interchangeability), material, fabrication, Seller’s supplier
place of manufacture, or outside processing. Seller
shall flow down this requirement to Seller’s Suppliers. | |
PRINTED CIRCUIT BOARDS (PCB) | |
PRINTED CIRCUIT BOARD MICRO-SECTION
Seller shall comply with all quality conformance inspection
requirements including submission of one micro-section per
IPC-TM-650 to Macrolink. |
|