Standard Terms And Conditions Of Purchases
 

16 March 2004

SUPPLIER PRODUCT ASSURANCE REQUIREMENTS

GENERAL REQUIREMENTS:  Unless otherwise specified in the purchase order, the following general requirements, terms and conditions apply to Macrolink purchase orders. 

Purchase Order Identification:  The Macrolink purchase order number must be plainly marked on all packages, bills of lading, invoices and shipping documentation.  Packing lists shall accompany each box or package shipment.  In the absence of a packing list, Macrolink count shall be conclusive.

Purchase Order Change:  Macrolink may at any time by written order make changes within the general scope of a purchase order in any one or more of the following: (1) Documentation, designs or specification. (2) Methods of shipment or packing. (3) Place of delivery. (4) Period of performance of work. (5) Delivery schedule.  If any such change causes an increase or decrease in the cost of work under a purchase order, an equitable adjustment shall be made in the purchase order price.  Macrolink reserves the right to terminate a purchase order at any time. Any claim by Seller for adjustment because of a purchase order change by Macrolink shall be made within thirty days from the date of receipt of change notification.

Entire Agreement:  The Purchase Order constitutes the entire agreement between Macrolink and the Seller.  The Seller, by shipping the goods ordered, agrees to the terms and conditions set forth.

Furnished Items:  Seller assumes complete liability for any Macrolink owned or Macrolink furnished tooling, items or materials lost, damaged or otherwise not satisfactorily dispositioned.  Title to all Macrolink furnished tooling, items or materials shall remain vested in Macrolink.

Electrostatic Protection and Packing/:  Devices identified as electrostatic discharge sensitive shall be handled, stored, packaged and shipped in such a manner as to preclude damage from electrostatic discharge.  Electrostatic protection process shall be modeled after EIA JESD-625.  The Seller shall be responsible for packing and preservation of the supplied item(s) to assure safe arrival at Macrolink in accordance with good practices. 

Conformance to Requirements:  The Seller shall be responsible for furnishing items that conform to the requirements of the purchase order and neither surveillance, inspection, and/or tests made by Macrolink or compliance with Product Assurance Requirements shall relieve the Seller of this responsibility.

Current Specifications:  Material ordered according to nationally recognized specifications or military standards shall be supplied in accordance with the latest revisions unless otherwise specified. 

Acceptance:  Unless otherwise specified, ownership of these goods shall pass from Seller to Macrolink at the f.o.b. point specified on the purchase order.  Passing of ownership does not constitute final acceptance of the goods nor does if waive any of the other provision of the purchase order.

All goods ordered will be subject to final inspection and approval by Macrolink after delivery, not withstanding prior payment.  The Seller expressly agrees that payment does not constitute final acceptance.  Macrolink may reject any items that contains defective material or workmanship, or does not conform the specifications.  Rejected items may be returned at the Seller’s risk and expense at the full invoice price plus applicable incoming transportation charges.  Approval by Macrolink inspection or failure to inspect shall not waive Macrolink’s rights on the guarantee or warranty by Seller.

Documentation:  Macrolink may refuse to accept items delivered under a purchase order if the Seller fails to submit the certification, documentation, test data or reports specified in the purchase order.

Unauthorized Repairs:  Without Buyer’s approval, Seller may not repair by welding, brazing, soldering or adhesives, parts damaged or found to be faulty during fabrication.  Defects in castings or forgings shall not be repaired by any method unless authorized by the Buyer in writing.

Change in Approved Processes, Materials or Procedures:  Seller shall not change or substitute any specified process, material or procedure without prior written Buyer approval.  The Seller shall not change any process, material or procedure from that used to qualify the process, material or procedure without prior notification to Buyer and approval by authorized customer representative.

Unauthorized Submittal of Production Parts:  When the purchase order requires Buyer acceptance of the first article, Seller shall not submit parts from a production run for Buyer inspection prior to Buyer’s acceptance of such first article.

Improper Resubmittal:  Articles rejected by the Buyer and subsequently resubmitted to the Buyer shall be clearly and properly identified as resubmitted articles.  Seller’s shipping documentation shall contain a statement that articles are replacement of reworked articles and shall also refer to Buyers rejection document.

Notification of Facility Change:  Seller shall not relocate any production, manufacturing and/or processing facilities during performance of the purchase order, without promptly notifying Buyer and affording Buyer an opportunity to examine such facilities for compliance with Quality Assurance requirements, including any necessary approvals.

Default Cancellation:  Macrolink reserves the right to cancel this order in the event of default by the Seller due to failure to delivery the item specified, comply with delivery dates and/or failure to meet the requirements specified in the purchase order including quality system requirements.

Indemnification:  All goods supplied must be free from any liability including but limited to royalties, patent rights, mechanics’ liens or other encumbrances.  Seller agrees to indemnify Macrolink against all claims, demands, costs and actions for actual or alleged infringements of patent rights in the use, sale or resale of supplied items or services.

Discrimination:  Seller agrees that in performing the work under this order the Seller will not discriminate against any employee because of race, religion, color, ancestry, sex, sexual orientation, age, disability or medical condition.  Seller agrees on any sub-contract under this order to insert a similar clause.

Law:  Seller warrants that no law, rule or ordinance of the United States, State or any other government entity has been violated in the manufacture, sale or in the performance of services covered by a purchase order and will defend and hold Macrolink harmless from loss, cost or damage as a result of any such actual or alleged violation.

Proprietary Property: When items are made to documentation furnished by Macrolink, unless such drawings are entirely of standard items made and/or furnished by Seller to the trade, the design shall be considered proprietary and private as belonging to Macrolink and Seller is not to disclose information or furnish others with the same items or services without the written permission of Macrolink.

Delays:  Seller will immediately notify Macrolink whenever an actual or potential labor dispute delays or any other event threatens to delay the timely performance of an order.

  

SPECIAL PRODUCT ASSURANCE REQUIREMENTS

SPAR-1

BUYER SOURCE INSPECTION

Items to be delivered under this purchase order require inspection, tests or surveillance by Macrolink Quality Representative at the Seller’s plant.  Sufficient advance notice (two working days) for local travel plus travel time for distant locations) must be given Macrolink to permit scheduling of source inspection.  The Seller shall notify Macrolink’s Purchasing Department when the product is ready for source inspection.  Source inspection does not relieve the Seller of the responsibility for compliance with all purchase order requirements.  Evidence of Macrolink source inspection must accompany or be shown on the shipping documentation.  Macrolink reserves the right of final acceptance at Macrolink’s facility.  Items submitted under this clause shall have passed Seller’s inspection and test.
 

SPAR-2

GOVERNMENT INSPECTION

Government inspection is required prior to shipment from Seller’s plant.  Upon receipt of this purchase order, Seller shall promptly notify the Government Representative who normally services the Seller’s plant, in order that appropriate planning for Government inspection can be accomplished.  If the representative of the Government Inspection Office cannot be located, Macrolink should be notified immediately.
 

SPAR-3

SELLER QUALITY CONTROL SYSTEM

The Seller shall maintain a quality system that complies, as a minimum requirement with the specification designated below.  The Seller’s system shall be subject to audit by Macrolink’s Quality Representative.  Waivers to quality system requirements are not valid unless obtained in writing from Buyer.

A. MIL-I-45208 (Latest revision as of date of purchase order)

B. ISO-9000-94 or 2000
 

SPAR-4

REPORT OF DISCREPANCY FOR MATERIAL REVIEW

A discrepancy report is to be initiated by the Seller for any departure from documentation, specifications or other purchase order requirements and must adequately describe such departures, including a complete description of the cause and corrective action taken to preclude recurrence.  The discrepancy report shall be submitted to Macrolink Purchasing Department that will arrange for material review.  A copy of the discrepancy report will be returned to the Seller, showing material review action taken.  Seller shall not ship a discrepant item reported on a discrepancy report without Buyer’s concurrence.

Seller shall refer to the number or date of the discrepancy report on each shipping document that covers items on the discrepancy report.  Items shipped on a discrepancy report must be segregated from other items to permit separate identification to be maintained.
 

SPAR-5

INSPECTION AND TEST PLAN

Seller shall prepare an inspection and test plan for the items delivered under the purchase order.  Tow copies of the plan shall be submitted for Macrolink a minimum of thirty days prior to production.

A. The plan shall include identification of the item to be inspected or tested, measured or test equipment to be used, method of inspection (visual test equipment, gage, et.) and the type of inspection (dimensional, functional, test, etc)

B. The plan shall contain the operation sequence and inspection/test points in relation to procurement manufacture, assembly checkout and delivery.
 

SPAR-6

INSPECTION TEST REPORT

Seller shall submit with each shipment a report for the delivered end items or assemblies.  The following information included as a minimum: part number, revision letter, nomenclature, purchase order number, lot number, quantity passed/rejected, date of inspection/test and signature/stamp of Seller’s Inspection/Test representative.

A. Summary of data and form only required.

B. Variable data is required.
 

SPAR-7

TEST SAMPLES

The seller shall furnish to Macrolink the test samples required by the purchase order.  The samples shall be identified as “Test Samples” with applicable part number.  The test samples shall be processed simultaneously with each batch or lot of parts.  Seller’s shipping document shall itemize “Test Sample” and the items themselves shall be properly identified.
 

SPAR-8

FIRST ARTICLE INSPECTION

Macrolink acceptance of first article is required prior to the production run.  The first article shall be identified as such, including the purchase order number, part number and part name.  The Seller is required to:

A. Submit the first article for test/inspection to be conducted at Seller’s facility by Macrolink.

B. Submit the first article to Macrolink Receiving Inspection Department for test/inspection by Macrolink at Macrolink facility.

C. Submit the first article to Macrolink Receiving Inspection Department together with documents showing the data representing results of Seller’s first article test/inspection, including actual dimension or value for each specified characteristic.
 

SPAR-9

ACCEPTANCE TEST PROCEDURE

Seller shall prepare an acceptance test procedure for the items to be delivered under the purchase order, to include as a minimum the equipment, sequence and steps necessary to perform the acceptance test.  The procedure shall contain a requirement for recording, including as a minimum the following data (for submission to Macrolink) part number, part name, revision letter, purchase order number, serial/lot number, sequence number, criteria measured or tested, test results, test date and signature of Seller’s Inspection Representative.  Two copies of the acceptance test procedure shall be submitted for Macrolink Quality Assurance approval at least 2 weeks prior to performance of the initial acceptance test.  Any subsequent change to the acceptance test procedure requires prior approval of Macrolink Quality Assurance representative.
 

SPAR-10

ACCEPTANCE TEST PROCEDURE (ATP) DATA

Seller shall submit with each delivery a completed copy of the related ATP data sheet(s) with each serialized/identified delivered end item.  The test data supplied must allow correlation of the tests and the items supplied.
 

SPAR-11

CERTIFICATION OF CONFORMANCE

A. With each shipment of items purchased Seller shall submit a certificate of conformance signed by a responsible representative which shall constitute a representation by the Seller that:

1.      The materials used are those which have been specified by Macrolink and that the items delivered were produced from material for which Seller has on file reports for chemical or physical analysis and any other required evidence of conformance of such items to applicable specifications.

2.      Processes used in the fabrication of items delivered were in compliance with applicable specification forming a part of the purchase order.

3.      The items as delivered comply with all specification and other requirements of the purchase order.

B. By making shipment under this purchase order, the Seller automatically certifies that the materials (except when the material are furnished by Macrolink) used in the item shipped and the processes applied to such articles comply with the applicable documentation and specifications.  The Seller agrees to retain objective evidence, including records of the inspection and tests performed in the course of manufacturing, testing inspection, preserving, packaging and packing of said items.  Those records shall be made available to Macrolink for review upon request.
 

SPAR-12

CONTROL OF SPECIAL PROCESSES

The Seller must be approved by Macrolink to perform required special processes of must use special process supplies acceptable to Macrolink.  Special processes indicated below require approval or certification of the process equipment and the procedures.  Certification by a responsible representative of the Seller shall be included with each shipment.  Certification shall indicate all special processes performed, applicable specifications (including class type, grade, etc.) and the name of special processor(s).

Special Processes:

A. Casting/Forgings  

B. Plating

C. Heat Treating

D. Silk Screening

E. Surface Finish, Coating, Treatment

F. Testing (NDT, Chemical, Environmental, etc)

G. Printed Circuit Board Fabrication

H. Other specified on purchase order
 

SPAR-13

MATERIAL IDENTIFICATION INSTRUCTIONS

A.     Apply part number and revision letter per applicable documentation note.

B. Bag and tag parts.

C. Tag parts

D. Identify per procurement instructions requirements

E. Identify parts in accordance with MIL-STD-130
 

SPAR-14

SERIALIZATION

With each shipment, the Seller shall submit a legible copy listing all serialized parts and assemblies by part number.  No two parts with the same part number are to have the serial number.  Seller shall maintain records identifying the serial numbers of serialized subassemblies contained in deliverable end items.
 

SPAR-15

LOT CONTROL AND MATERIAL TRACEABILITY

A. Items furnished under this purchase order, packing list, certification and other applicable documents must be identified with a date code and lot symbol as established in MIL-STD-1285 latest revision. Lot identification shall appear as close to the part number as reasonable.  Where impractical to mark item the lot symbol shall be marked on identifying tags.

B. Materials used must be identified by lot number, material type, specification and applicable change number, heat number, etc. and traceable to the lot number(s) of material(s) used.  Traceability records shall be acai8lable for review by Macrolink representatives.

C.    Items furnished under this purchase order, packing list certification and other applicable documents must identify the Seller’s lot or batch number.  Where impractical to mark individual parts, items may be tagged or bagged marked with appropriate identification.
 

SPAR-16

AGE CONTROL

The Seller shall have an effective system of age control of items whose acceptability is limited by age of the item.  The system must include a method of identifying the age of such items and provisions for the rotation of stock.  The time lapse between manufacture and the delivery date must not exceed one-forth (25%) of the shelf life when compared to the end of life date for the material supplied without prior written waiver by Macrolink on a one time basis.
 

SPAR-17

GOVERNMENT REVIEW OF QUALITY CONTROL OR INSPECTION

The Seller’s Quality Control or Inspection Systems and manufacturing processes are subject to review, verification and analysis by authorized Government Representatives upon request.
 

SPAR-18

MACROLINK SUPPLIED INFORMATION

With the initial order, Macrolink will furnish at no cost to the Buyer two legible copies of applicable specifications, drawings and/or catalogs or catalog pages sufficient to inspect and/or test the product(s) specified in the purchase order.
 

SPAR-19

PRODUCT CHANGE APPROVAL

The Seller shall not make any changes in the end items accepted by Macrolink under a previous purchase order without prior written approval by Macrolink.  These changes include product design, composition, configuration (form, fit, function or interchangeability), material, fabrication, Seller’s supplier place of manufacture, or outside processing.   Seller shall flow down this requirement to Seller’s Suppliers.
 

SPAR-20

NOTIFICATION OF PRODUCT CHANGE

Prior to delivery, Seller shall notify Macrolink of any significant changes in product design, fabrication methods, material or processing from those used by Seller at time of Seller’s quotation of offer to Macrolink, which resulted in the Purchase Order.
 

SPAR-21

PRINTED CIRCUIT BOARDS (PCB)

The Seller shall be certified manufacturer per ANSI/IPC A-610.  When required, swaged terminals shall meet the requirements of IPC-275.
 

SPAR-22

PRINTED CIRCUIT BOARD MICRO-SECTION

Seller shall comply with all quality conformance inspection requirements including submission of one micro-section per IPC-TM-650 to Macrolink.
 

 


Macrolink, Inc. 1500 North Kellogg Drive Anaheim, California 92807-1902
Phone 714.777.8800 Fax 714.777.8807

Macrolink and the Macrolink logo are registered trademarks of Macrolink, Inc. Prices and specifications are subject to change without notice. Copyright 2004, Macrolink, Inc. All rights reserved.

Homepage | Contact Us